Distinguish ownership from physical location.
A condo bathroom is not only the room inside your door. Waterproofing, a shutoff and a pipe in the wall may involve the building as well as the unit. Finishes chosen first are the ones that have to come back off if those answers change.
01Distinguish ownership from physical location
A pipe that passes through your bathroom is not automatically yours to move. Ask what the building documents say about shared stacks, shutoffs and the wet wall before the plan depends on them. Location and responsibility are different facts.
02Arrange the shutoff before scheduling installation
Know which valve isolates the bathroom, who may operate it, and how much notice the building requires. A fixture delivery is not a shutoff plan. If the only valve serves other units, the schedule has to say so before demolition.
03Treat waterproofing as a complete assembly
The shower floor, the curb or the level entry, the niches and the glass are one assembly. A new tile on an old pan is not a new waterproofing plan. Have the existing condition checked, and design the assembly for the bathroom you are actually building.
04Coordinate the bathroom with the building
Work hours, protection of the hall, debris routes and any required building review belong in the same scope as the tile. A condo rule is not a courtesy. Write it into the logistics before the first delivery.
Resolve ownership, shutoff coordination and the complete waterproofing assembly before selecting the bathroom’s visible finishes.The Sarokey approach
05Close out more than the finish list
Closeout includes the shutoff returned to its normal position, the waterproofing record, and the common area cleared. Confirm what the jurisdiction and the building each require. A finished bathroom that the building cannot service is not finished.